Top Down

Pioneer of Design and Implement Soil Improvement Methods

Implementing Top Down
More detail

Providing soil and foundation engineering services

We bring you the highest level of safety and satisfaction with our experience and world-class knowledge

Retaining wall

The Retaining wall is used to increase the safety and stability of the walls of ditches and earth trenches and has different types.

بیشتر بخوانید

Excavation Stabilization

In recent decades, with the development of large cities and rapid population growth, the need to build high-rise buildings, which often have several basements, is strongly felt.

بیشتر بخوانید

Micropile

Prefabricated micropiles are elements that are pushed into the ground by impact or vibration, so during installation, they move the surrounding soil and push it forward.

بیشتر بخوانید

Nailing, Anchorage and Berlin wall

The nailing system involves reinforcing (not retracting) the ground by installing and executing steel rebars close together, which are subsequently restrained into the slurry.

بیشتر بخوانید

Top Down

In this method, basement retaining walls are implemented first. Excavation is then performed under the roof slab and strata are installed to hold retaining walls.

Read More

Advice and supervision

Retaining wall design and soil improvement methods

The choice of the appropriate method for the implementation of the guard structure can be in different situations, in various ways based on theoretical principles and also influenced by practical, experimental and optimization considerations.

بیشتر بخوانید

Surveying and monitoring (micro geodesy)

Having a competent surveying team (with work experience in similar projects) is required. The use of appropriate monitoring methods based on the dimensions of the project (free station, micro geodesy and instrumentation) is mandatory.

بیشتر بخوانید

Holding tenders for geotechnical projects

According to the definition of bidding law, bidding is a competitive process to provide the desired quality (according to the bidding documents), in which the subject-matter obligations are offered to the bidder who has the lowest “appropriate” price.

بیشتر بخوانید

Monitoring the implementation, consulting and plan controlling

Short-term and long-term performance monitoring and quality of materials are monitored to evaluate the performance of stabilization systems. An employer representative, consultant, or a combination of both can inspect the construction of the wall.

بیشتر بخوانید

Complementary soil mechanics studies

Site inspection and laboratory tests are two of the most critical aspects of any construction and mining project and have a direct impact on the technical feasibility and optimization of project costs.

بیشتر بخوانید

Compilation and translation of specialized books

Reinforced soil book

Book summary:

Reinforced soil is a collection of embankments (usually granules) in which the reinforcing elements in the soil, in the form of belts, are rebars. Reinforced soil is generally resistant to pressure and shear, but weak to traction. In reinforced soil, the presence of reinforcing elements in the direction of tensile strain improves soil behavior.

مطالعه کنید

Soil Improvement book

Book summary:

Reinforcement strategies for foundation and in fact soil improvement under the foundation is one of the main problems in the construction of structures. With the increase in population and the observation of damages caused by earthquakes and other natural factors, this problem and the human need to create strong and durable structures and to strengthen and improve old structures has become more and more widespread.

مطالعه کنید

Anchorage book

Book summary:

The principles of implementation of the restraint or anchorage method have many similarities with the nailing method. The main difference is in the application of post-tension force to the reinforcing element. Execution steps are similar to the nailing method and include cross-sectional excavation, borehole drilling, reinforcement installation, and.

مطالعه کنید

Nailing book

Book summary:

Nailing was a creative technique used by Australian engineers to stabilize tunnel walls. After that, the use of nailing was used in various construction projects such as stabilization of railway trenches and highways, construction of excavated guard structures in the areas.

مطالعه کنید

Micropile book

Book summary:

Piles are generally divided into two main groups: displacement piles and replacement piles. Micropiles are small replacement piles (usually less than 300 mm in diameter) that are often accompanied by light steel reinforcement and cement grout injection.

مطالعه کنید
Get Books
0
Completed Projects
0
Ongoing Projects
0
Number of Personnel

Ongoing Projects

Selected Complete Projects

All Projects

Our Services Process

Dear employers’ opinion about Peyban

I am Ghotbizadeh, Executive Manager of Sepidar Project, Jordan Street, our digging depth was close to 17 meters. The north and south sides are the nailing and anchorage system, the east and west sides are the truss system, the movements are within the allowable and standard level. Peyban Engineering Technical Company finished our work, safely. Thank you very much.

Mr. Ghotbizadeh, Jordan Sepidar Poject

In the name of God, Considering the difficulty of excavation and stabilization processes in urban environments, selecting a capable contractor is a very significant issue. We entrusted the design, stabilization and excavation processes of the Mirdamad North Razan project to the Peyban group under the management of Dr. Majid Mohagheghi. Peyban Co. continued the project phases including the construction and installation of guard structures, panel removal, shotcrete, and excavation with regular planning. Finally, the 14.5-meter excavation process of the project was completed in the shortest possible time but with the best quality

Mr. Kelayeh, Mirdamad North Razan project

In the name of God. I’m glad to have the opportunity to explain about Peyban as a stabilization contractor. Because of importance of the speed, accuracy, and honesty in the words and actions of the contractor, I feel that the stabilization project is a major construction project. I saw these features in Peyban Company very strongly. I know this Peyban Company for 10 years. The economic conditions of the country are weak and the prices are changing every day, so the companies cannot fulfill their obligations under the contract. But Peyban Company, which is a very strong stabilizer, has also proved its stability to fulfill its obligations, and I am glad that for conducting this project well.

Mr. Mohaghegh, Saadat Abad project

We entrusted the soil stabilizer operation to Peyban Engineering Company and during the contract we signed with Dr. Mohagheghi, the stabilization of the pit is by nailing and anchorage and truss retaining structure methods. The weight of the structure is about 200 tons and the excavation area is about 1600 square meters. Excavation is done in two steps. The digging depth on the north side and south side is about 14 and 16 meters respectively. Digging began with a well-drilling operation and 48 wells were timely drilled by about twenty days

Eskan Sanat Pars Company, Khatam Al Nabeein project

I am Amir Akbari, the project manager of Yas Gholhak, my previous projects were in the form of complete traditional nailing and stabilization. Therefore, we decided to set up our new project based on modern technology. The new project is implemented based on top-down stabilization. According to our research and review, we concluded that we can entrust Peyban Co., which was one of our options, moreover, we have been working with this company for a year. Their technical team was very professional so that we are completely satisfied with the top-down stabilization system

Mr. Akbari, Gholhak Project

I am Bayat, the owner of Ivan Farmanieh commercial and administrative project. Our project complex is 64,000 cubic meters of excavation volume at a depth of 30 meters from the base level, which was done by the Peyban company monitoring by Dr. Mohagheghi. From the beginning to the end, we had no problems with agile forces and experienced personnel. This project was completed in perfect health. Our project is a combination of TopDown, Nailing, and Strand basically. We completely used the top-down method of the western side of our project. That excavation, speculation, and execution of the gallery and all the cases were done by Peyban company within the specified time.

Mr. Bayat, Farmanieh Project

Our Blog

Geotechnical Articles

Older Blogs

Contact us for advice

Our Technical team ready to answer your questions