Peyban Company, a leader in the design and implementation of the latest soil and foundation engineering methods
In the first step of our collaboration, we provide consultation and technical, scheduling, and economic proposals for comparing and selecting excavation stabilization and soil improvement techniques. In this regard, you are invited to read the following two articles:
Implementation of Concrete Structures Using the Top-Down
More detailCFA, Jet Grouting, DSM, Rigid Inclusion
More detailProviding soil and foundation engineering services
We bring you the highest level of safety and satisfaction with our experience and world-class knowledge
Consultation and Supervision of Company Projects
Monitoring the implementation, consulting and plan controlling
Compilation and translation of specialized books
Reinforced soil book
Book summary:
Reinforced soil is a collection of embankments (usually granules) in which the reinforcing elements in the soil, in the form of belts, are rebars. Reinforced soil is generally resistant to pressure and shear, but weak to traction. In reinforced soil, the presence of reinforcing elements in the direction of tensile strain improves soil behavior.
Soil Improvement book
Book summary:
Reinforcement strategies for foundation and in fact soil improvement under the foundation is one of the main problems in the construction of structures. With the increase in population and the observation of damages caused by earthquakes and other natural factors, this problem and the human need to create strong and durable structures and to strengthen and improve old structures has become more and more widespread.
Anchorage book
Book summary:
The principles of implementation of the restraint or anchorage method have many similarities with the nailing method. The main difference is in the application of post-tension force to the reinforcing element. Execution steps are similar to the nailing method and include cross-sectional excavation, borehole drilling, reinforcement installation, and.
Nailing book
Our Services Process
Dear employers’ opinion about Peyban
I am Ghotbizadeh, Executive Manager of Sepidar Project, Jordan Street, our digging depth was close to 17 meters. The north and south sides are the nailing and anchorage system, the east and west sides are the truss system, the movements are within the allowable and standard level. Peyban Engineering Technical Company finished our work, safely. Thank you very much.
In the name of God, Considering the difficulty of excavation and stabilization processes in urban environments, selecting a capable contractor is a very significant issue. We entrusted the design, stabilization and excavation processes of the Mirdamad North Razan project to the Peyban group under the management of Dr. Majid Mohagheghi. Peyban Co. continued the project phases including the construction and installation of guard structures, panel removal, shotcrete, and excavation with regular planning. Finally, the 14.5-meter excavation process of the project was completed in the shortest possible time but with the best quality
In the name of God. I’m glad to have the opportunity to explain about Peyban as a stabilization contractor. Because of importance of the speed, accuracy, and honesty in the words and actions of the contractor, I feel that the stabilization project is a major construction project. I saw these features in Peyban Company very strongly. I know this Peyban Company for 10 years. The economic conditions of the country are weak and the prices are changing every day, so the companies cannot fulfill their obligations under the contract. But Peyban Company, which is a very strong stabilizer, has also proved its stability to fulfill its obligations, and I am glad that for conducting this project well.
We entrusted the soil stabilizer operation to Peyban Engineering Company and during the contract we signed with Dr. Mohagheghi, the stabilization of the pit is by nailing and anchorage and truss retaining structure methods. The weight of the structure is about 200 tons and the excavation area is about 1600 square meters. Excavation is done in two steps. The digging depth on the north side and south side is about 14 and 16 meters respectively. Digging began with a well-drilling operation and 48 wells were timely drilled by about twenty days
I am Amir Akbari, the project manager of Yas Gholhak, my previous projects were in the form of complete traditional nailing and stabilization. Therefore, we decided to set up our new project based on modern technology. The new project is implemented based on top-down stabilization. According to our research and review, we concluded that we can entrust Peyban Co., which was one of our options, moreover, we have been working with this company for a year. Their technical team was very professional so that we are completely satisfied with the top-down stabilization system
I am Bayat, the owner of Ivan Farmanieh commercial and administrative project. Our project complex is 64,000 cubic meters of excavation volume at a depth of 30 meters from the base level, which was done by the Peyban company monitoring by Dr. Mohagheghi. From the beginning to the end, we had no problems with agile forces and experienced personnel. This project was completed in perfect health. Our project is a combination of TopDown, Nailing, and Strand basically. We completely used the top-down method of the western side of our project. That excavation, speculation, and execution of the gallery and all the cases were done by Peyban company within the specified time.
Our Blog
Geotechnical Articles
What is Deep Soil Mixing (DSM)?
What is Deep Soil Mixing (DSM)? Deep Soil Mixing (DSM) is a soil improvement and stabilization method in which additives such as cement, lime, or fly ash are mechanically mixed with the in-situ soil to
Excavation and Its Importance in Construction Projects
Excavation and Its Importance in Construction Projects Excavation is one of the initial and crucial stages in the construction process, involving the removal of soil, rock, and other materials from the ground to create a