Project Description: Monitoring of the pit wall, design control, calculations and monitoring the implementation of stabilization operations of the excavation walls of the project by nailing and anchoring (strand) method and using in-place piles (Soldier Pile) and drainage with gallery and geotextile
Employer Name: Persia Esfandiar Company
Date of implementation: September 2014
Project location: Tehran, Jordan St., Esfandiar Blvd., facing Eghtesad Novin Bank
Description: Excavation depth of 21 meters, overhead of old buildings and restraint of a tree and tower crane around the project with a convex angle, excavation from level -10 onwards was done with drainage.