Project Description: Excavation, and operation of wall stabilization by truss methods
Employer Name: Mr. Moslehi
Date of implementation: 2016
Project location: Tehran, Jordan St., Babak Bahrami St
Description: Deviation of aqueduct and stabilization of excavation walls on 4 sides by truss method with maximum displacement of 4 mm at the top of the wall