پروژه های در حال اجرا
Farmaniyeh Medical Complex (Part I)
+Project Description: Excavation, design, and operation of wall stabilization by anchorage method and the making of reinforced berms and installation of structural columns by top-down method +Employer Name:
Farmaniyeh Medical Complex (Part II)
+Project Description: Berm excavation, stabilization of the west and south sides walls of the pit by connecting the structure to the top-down method`s columns and installing struts +Employer
Niatos Paradise Complex (Part I)
+Project Description: Design, and operation of wall stabilization by concrete piles and nailing methods and permanent drainage +Employer Name: Sahih Al-Nasab Engineers Group +Date of implementation: June 2019
Niatos Paradise Complex (Part II)
Project Description: Operations of bed consolidation and foundation strengthening by bearing micropile method Employer Name: Sahih Al-Nasab Engineers Group Date of implementation: March 2019 Project location: Tehran, Elahieh,
Gallery Center Commercial Office Complex
+Project Description: Carrying out drilling operations, installation of Nile and anchor with a length of 22 km +Employer Name: Sahih Al-Nasab Engineers Group +Date of implementation: May 2011
Residential tower of Velenjak 15 Street
Project Description: Carrying out drilling operations, installation of Nile and anchor with a length of 20 km Employer Name: Sahih Al-Nasab Engineers Group Date of implementation: May 2012
Amaniyeh Residential Complex
Project Description: Excavation, design, and operation of wall stabilization by a combined method of nailing, anchorage and truss structure, strut, concrete piles, and drainage operations Employer Name: Mr.
(2) Traffic Organization Building
Project Description: Design, and operation of wall stabilization by nailing, anchorage methods and installation of wall posts, in cooperation with Boomshahr Engineering and Construction Company Employer Name: Transportation and
Zomorod Commercial Office Complex
Project Description: Excavation, design, and operation of wall stabilization by nailing, anchorage method and using in-situ piles Employer Name: Yaran Sazeh Tadbir Company Date of implementation: September 2015 Project
Second phase of Iranian Complex (1)
Project Description: Design, and operation of wall stabilization by anchorage method and floating pile Employer Name: Mr. Hassan Taj Date of implementation: 2016 Project location: Tehran, Fadaiyan-e-Islam St.,
Second phase of Iranian Complex (2)
Project Description: Design, and operation of wall stabilization by strut method added to the project in the first part in the eastern part Employer Name: Mr. Hassan Taj
Second phase of Iranian Complex (3)
Project Description: Design and implementation of bed consolidation operations and foundation strengthening by bearing micropile method Employer Name: Mr. Hassan Taj Date of implementation: 2017 Project location: Tehran,
منتخب پروژه های تمام شده
Niatos Paradise Complex (Part I)
+Project Description: Design, and operation of wall stabilization by concrete piles and nailing methods and permanent drainage +Employer Name: Sahih Al-Nasab Engineers Group +Date of implementation: June 2019
Niatos Paradise Complex (Part II)
Project Description: Operations of bed consolidation and foundation strengthening by bearing micropile method Employer Name: Sahih Al-Nasab Engineers Group Date of implementation: March 2019 Project location: Tehran, Elahieh,
Gallery Center Commercial Office Complex
+Project Description: Carrying out drilling operations, installation of Nile and anchor with a length of 22 km +Employer Name: Sahih Al-Nasab Engineers Group +Date of implementation: May 2011
Residential tower of Velenjak 15 Street
Project Description: Carrying out drilling operations, installation of Nile and anchor with a length of 20 km Employer Name: Sahih Al-Nasab Engineers Group Date of implementation: May 2012
Amaniyeh Residential Complex
Project Description: Excavation, design, and operation of wall stabilization by a combined method of nailing, anchorage and truss structure, strut, concrete piles, and drainage operations Employer Name: Mr.
(2) Traffic Organization Building
Project Description: Design, and operation of wall stabilization by nailing, anchorage methods and installation of wall posts, in cooperation with Boomshahr Engineering and Construction Company Employer Name: Transportation and
Zomorod Commercial Office Complex
Project Description: Excavation, design, and operation of wall stabilization by nailing, anchorage method and using in-situ piles Employer Name: Yaran Sazeh Tadbir Company Date of implementation: September 2015 Project
Second phase of Iranian Complex (1)
Project Description: Design, and operation of wall stabilization by anchorage method and floating pile Employer Name: Mr. Hassan Taj Date of implementation: 2016 Project location: Tehran, Fadaiyan-e-Islam St.,
Second phase of Iranian Complex (2)
Project Description: Design, and operation of wall stabilization by strut method added to the project in the first part in the eastern part Employer Name: Mr. Hassan Taj
Second phase of Iranian Complex (3)
Project Description: Design and implementation of bed consolidation operations and foundation strengthening by bearing micropile method Employer Name: Mr. Hassan Taj Date of implementation: 2017 Project location: Tehran,
Marjan Garden construction project
Project Description: Design, and operation of wall stabilization by nailing, anchorage methods, and floating pile Employer Name: Mr. Abtan Date of implementation: 2015 Project location: Tehran, Zafaranieh, Kayhan
Tonekabon Office Commercial Complex
Project Description: Design and implementation of soil improvement operations and strengthening of foundations by bearing micropile method Employer Name: Mr. Hedayati Date of implementation: July 2017 Project location:
Nastaran Residential Complex
Project Description: Excavation, design, and operation of wall stabilization by truss structure method Employer Name: Mr. Asefi Date of implementation: January 2019 Project location: Tehran, Niavaran, Aqzasieh neighborhood, Nastaran street
Khatam Al-Nabieen Medical Complex
Project Description: Excavation, design, and operation of wall stabilization by nailing, anchorage, and truss structure methods Employer Name: Mr. Salmani Date of implementation: March 2019 Project location: Tehran, Damavand
Mehrdad Residential Complex
Project Description: The operation of consolidating the bed and strengthening the foundation by performing the bearing micropile Employer Name: Mr. Khanipour Date of implementation: January 2013 Project location:
Tat Office Commercial Building
Project Description: Excavation, design, and operation of wall stabilization by nailing and anchorage methods with a length of 15 km Employer Name: Sarang Geotechnology Services Company Date of implementation: